On behalf of Melbourne Water, John Holland KBR JV and Geomembrane Technologies Inc. (GTI) have designed and constructed a floating biogas collection cover and piping headworks for the Western Treatment Plant’s 25W anaerobic lagoon. The 7.6 hectare cover and 500m of large diameter pipe took just over 12 months to complete.